< Back to Ceres Finished Water Transmission Main
Page
Concrete placed for Ceres pipeline Air release valve
Traffic Control in place along Hatch Road
A traffic flagger at Hatch Road
A laborer finishing the concrete at a manhole along Hatch Ave.
30” Pipe lay on Hatch road.
Pipe installation underway at the Ceres Finished Water Transmission Main along Hatch Road