Ceres Finished Water Transmission Main

24-hour Construction Information:
(888) 226-0986

The Ceres Finished Water Transmission Main  (FWTM) alignment will connect the WTP to a city-owned terminal storage tank to be constructed at the Ceres River Bluff Regional Park separately by the City. The transmission main will be 30-inches in diameter and approximately 5 miles long and capable of conveying up to 15 million gallons per day (mgd) of surface water to Ceres. The transmission main will be constructed primarily along Hatch Road.