The Water Treatment Plant (WTP) will include a conventional treatment process featuring sedimentation/flocculation, primary ozone disinfection, and granular media filtration. The initial capacity of the WTP will be 15 million gallons per day (mgd), with 5 mgd allocated to Ceres and 10 mgd allocated to Turlock. The WTP is designed to facilitate future expansion. The future build-out capacity of the WTP is envisioned to be 45 mgd.
Water Treatment Plant Construction Timelapse
All Construction Videos To Date
-
-
Drone footage over the Water Treatment Plant
-
Watch Video
-
-
-
Placing geo fabric in the clear well
-
Watch Video
-
-
-
Drone Footage taken May 12, 2021
-
Watch Video
-
-
-
Inside the clear well excavation, 30 feet below the original sub-grade
-
Watch Video
-
-
-
Mass excavation- Water Treatment Plant
-
Watch Video
-
-
-
Mass excavating at the Water Treatment Plant
-
Watch Video
-
-
-
Clear well excavation happening at the Water Treatment Plant
-
Watch Video
-
-
-
Clear well excavation underway at the Water Treatment Plant
-
Watch Video
-
-
-
Mass excavation underway at the Water Treatment Plant
-
Watch Video
-
-
-
Clear well excavation at the Water Treatment Plant
-
Watch Video
-