December
Flocculation Sedimentation building
Outfall Structure
Outfall Structure
Work underway at the Flocculation Sedimentation Building
Water storage tank after completion of shotcrete application
Outfall Structure excavation.
Prepping for concrete placement at the Flocculation Sedimentation building
November
Drying Beds
Cables wrapped around the water storage tank
Shotcrete application at the water storage tank
Concrete placement at Flocculation Sedimentation building
Liner prep at drying beds
Hydro Blasting Clear Well tank.
Rebar at the Flocculation Sedimentation building
Water storage tank wrapping machine
Flocculation Sedimentation upper mat rebar installation
Back Wash equalization basin
October
Work underway at the Water Storage Tank
Forms being installed at the Backwash Equalization Basin
Flocculation Sedimentation piping in the drying beds
2nd Concrete placement at Backwash EQ Walls.
September
The first concrete placement of the water storage tank dome was completed on 9/27
The first wall pour at the Backwash Equalization Basin was recently completed.
Reinforcing bar is being placed on the northwest side of the water storage tank dome
Water storage tank dome reinforcement
The contractor continues to excavate and install 12” unthickened sludge lines for the drying beds.
The contractor continues to erect scaffolding to support the dome on the inside of the water storage tank
August
DN Tanks continues to install form work for the underside of the Dome.
The contractor is installing falsework for the underside of the water storage tank dome.
The contractor is continuing to erect dome shoring on floor slab of the water storage tank.
Contractor continuing to erect dome shoring on floor slab.
The Contractor continues to erect shoring for the concrete water storage tank roof.
Wall installation underway for the Water Storage Tank
July
Wall installation underway for the Water Storage Tank
Concrete walls being installed in the Water Storage Tank
Wall installation underway for the Water Storage Tank
Continued wall pours for the water storage tank
June
Initial Water Storage Tank concrete wall placement.
Contractor installing wall forms for the water storage tank.
The contractor is placing reinforcing bar and wall forms at the Backwash Equalization Basin.
Pre-manufactured steel wall forms are being placed at the water storage tank.
May
Placing and compacting base rock at the Backwash Equalization Basin
The contractor is placing and compacting base rock for the water storage tank
The contractor is placing and compacting base rock for the filter backwash basin
Reinforcing steel is being installed on one half of the storage tank floor in advance of a 500 cubic yard concrete pour this week.
The contractor is placing and compacting base rock for the water storage tank
Placing rock over the geo fabric at the water treatment plant
Placing rock over the geo fabric at the water treatment plant
Aerial view of the work underway at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant
Aerial image of work at the Water Treatment Plant
Aerial image of work at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant
April
Forms for for the concrete barriers on the Aldrich Rd bridge
Forms for for the concrete barriers on the Aldrich Rd bridge
Mass excavation underway at the Water Treatment Plant.
Mass excavation underway at the Water Treatment Plant.
Mass excavation underway at the Water Treatment Plant.
Geo fabric being placed as a first step to constructing a 5 million gallon water reservoir
Forms for for the concrete barriers on the Aldrich Rd bridge
Aldrich Road bridge concrete barrier pour
Aerial view of the construction at Aldrich Road Bridge
March
Building formwork on the Aldrich Road Bridge
Form work on the sides of the Aldrich Road Bridge
Form work on the sides of the Aldrich Road Bridge
Mass excavation at the Water Treatment Plant site
The tension bars extend from the side of the girders at the Aldrich Road Bridge
Tension bars extend from the side of the Aldrich Road Bridge
A closer look at the tension bar extending from the girders on the Aldrich Road Bridge
A paddle wheel scraper works at the Water Treatment Plant site. These are used to move the material being excavated.
Mass excavation at the Water Treatment Plant site
Grouting at the Aldrich Road Bridge Replacement Project.
Grouting at the Aldrich Road Bridge Replacement Project.
Mass excavation underway at the Water Treatment Plant site.
Mass excavation underway at the Water Treatment Plant Site
Mass excavation underway at the Water Treatment Plant site
Mass excavation at the Water Treatment Plant site
Girder placement at the Aldrich Road Bridge Replacement Project.
Girder placement at the Aldrich Road Bridge Replacement Project
Girder placement at the Aldrich Road Replacement Project
Site clearing is underway at the Water Treatment Plant site
New foundations being installed at the Aldrich Road Bridge Replacement Project
Work is under way at the Aldrich Road Bridge Replacement Project
Search results
Website Accessibility Statement
Stanislaus Regional Water Authority (the "District") is committed to ensuring that its services are accessible to all
members of the public. As part of this commitment, the District strives to provide an accessible website compatible with
the Web Content Accessibility Guidelines (WCAG) version 2.1, AA, and commercial screen reading software. Features of the
website are created to allow individuals with vision and other impairments to understand and use the website to the same
degree as someone without disabilities.