Skip to main content

Turlock Finished Water Transmission Main 2021

Click the months below to filter through construction photos.

October 
September 
May contain: road
Pipe along Berkeley Road
A worker in a high-visibility vest levels wet concrete with tools at a construction site.
The contractor is placing concrete for a maintenance hole at the corner of Service and Berkeley.
August 
July 
Construction site with a trench for pipes next to an orchard.
Pipeline installation is underway for the Turlock Finished Water Transmission Main
A rural road with large pipes on one side and orchard trees on the other.
42 inch pipe is being staged along Aldrich Road
June 
An asphalt paver on a construction site with roadwork signs and equipment, timestamped from June 2022.
Paving underway at Zeering and Quincy