Water Supply Alternatives | 2/19/2019 | PDF | 3MB |
Operations Technology Preliminary Design | 1/07/2019 | PDF | 165kB |
Summary of Life Cycle Cost Analysis Tool | 1/07/2019 | PDF | 561kB |
Manganese Removal Bench-Test Results Nov 2018 | 11/15/2018 | PDF | 7MB |
Preliminary Design of Replacement Bridge at Aldrich Road and TID Ceres Main Canal | 10/30/2018 | PDF | 2MB |
Bench Test Results - Seasonal Ozone Demand | 9/18/2018 | PDF | 2MB |
Raw Water System Surge Analysis | 8/02/2018 | PDF | 2MB |
Finished Water System Surge Analysis | 8/02/2018 | PDF | 2MB |
Draft Pre-design of the SRWA Water Treatment Plant | 7/11/2018 | PDF | 6MB |
Preliminary Design of SRWA Raw Water Pump Station | 7/05/2018 | PDF | 9MB |
Source Water Quality Assessment | 3/20/2018 | PDF | 1MB |
Addendum to Cost Comparison TM | 11/27/2017 | PDF | 179kB |
Project Definition at Conclusion of Phase 1 | 11/08/2017 | PDF | 3MB |
Bench Test Results | 10/18/2017 | PDF | 3MB |
Treatment Process Alternatives 2 | 7/07/2017 | PDF | 4MB |
Allocation of Surface Water Supply Project Costs | 11/10/2016 | PDF | 283kB |
Historical Water Quality Assessment | 8/22/2016 | PDF | 3MB |
Public Outreach Plan | 8/22/2016 | PDF | 226kB |
Transmission Pipeline Low Flow Velocities | 8/22/2016 | PDF | 316kB |
Treatment Process Alternatives | 8/22/2016 | PDF | 726kB |
Water Quality Sampling Plan | 8/22/2016 | PDF | 3MB |
Funding Strategy | 8/11/2016 | PDF | 232kB |
Pipeline Alignment | 8/11/2016 | PDF | 2MB |
Prelim Phasing and Plant Sizing | 8/11/2016 | PDF | 531kB |
Treatment Performance Goals | 8/11/2016 | PDF | 75kB |