< Back to Water Treatment Plant Page
Click the months below to filter through construction photos. By default the latest month is displayed.
Placing and compacting base rock at the Backwash Equalization Basin
The contractor is placing and compacting base rock for the water storage tank
The contractor is placing and compacting base rock for the filter backwash basin
Reinforcing steel is being installed on one half of the storage tank floor in advance of a 500 cubic yard concrete pour this week.
The contractor is placing and compacting base rock for the water storage tank
Placing rock over the geo fabric at the water treatment plant
Placing rock over the geo fabric at the water treatment plant
Aerial view of the work underway at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant
Aerial image of work at the Water Treatment Plant
Aerial image of work at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant