Skip to content
The Stanislaus Regional Water Authority logo
  • Home
  • Regional Surface
    Water Supply Project 
    • About
    • Project Updates
    • Employment Opportunities
    • FAQs
    • Map
  • Project
    Documents 
    • General Documents
    • Request for Proposals
    • Technical Memorandums
  • Construction 
    • Construction Activities
    • Wet Well
    • Raw Water Pump
      Station
    • Raw Water Pipeline
    • Water Treatment Plant
    • Ceres Finished Water
      Transmission Main
    • Turlock Finished Water
      Transmission Main
  • Board
    Meetings
  • Contact
Aerial view of the work underway at the Water Treatment Plant mobile banner.
Aerial view of the work underway at the Water Treatment Plant desktop banner.

Water Treatment Plant 2023

< Back to Water Treatment Plant Page
  • February
  • January
There are no images associated with this tag.
Concrete poured around light pole bases
Maintenance Repair metal building trim work underway
Veneer installation at the Admin Operations Building
Electrical duct banks around job site
Sheet rock installation at the Maintenance and Repair Building
Pipe installation at the Rapid Mix Tank
48” valve installation at the Flow Split Facility
The Drying beds are almost full from the recent rains
Installing final pipes from the Rapid Mix to the Flocculation Sedimentation structure.
Clearwell is completely backfilled
Ozone Contactors structure: concrete is complete and tank has been filled.
Chemical Building: sheet rock being installed.
Ozone Contactors pipe gallery.
Sitemap
Copyright © 2023 stanrwa.com

Stanislaus Regional Water Authority

  • Home
  • Regional Surface
    Water Supply Project 
    • About
    • Project Updates
    • Employment Opportunities
    • FAQs
    • Map
    • Back
  • Project
    Documents 
    • General Documents
    • Request for Proposals
    • Technical Memorandums
    • Back
  • Construction 
    • Construction Activities
    • Wet Well
    • Raw Water Pump
      Station
    • Raw Water Pipeline
    • Water Treatment Plant
    • Ceres Finished Water
      Transmission Main
    • Turlock Finished Water
      Transmission Main
    • Back
  • Board
    Meetings
  • Contact
Skip to content
Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset
  • SitemapSitemap