Inside the Sedimentation Basin
Maintenance Bldg. Under construction
Operations Bldg. metal stud framing.
Concrete placement at the Chemical Storage
Metal stud framing in the Operations Bldg
Insulated wall panels installed at the Ozone building
Meta stud framing in the Operations building
Rebar and formwork at the Chemical Storage facility
Prep work for Fire proofing in the Operations Building
Maintenance Building work in progress
Chemical Storage tanks delivered to the site.
Electrical conduits installed at the Flocculation Sedimentation structure.
Work on the Maintenance Building continues