Finish Water Pump Station
Ozone Contactors Pipe Gallery
Infiltration Gallery rebar inspection.
Motor Control Center (MCC’s) installed at the Ozone Bldg.
Finish water Pump station metal Bldg.
Vertical Turbine pump assembly
Maintenance Bldg. Under construction
The first sheet rock installed in the Ozone Building
Metal stud framing in the Operations Bldg.
Canopy at the Chemical Storage structure.
Slab On Grade prep work at the Finish Water Pump Station