< Back to Water Treatment Plant Page
Click the months below to filter through construction photos. By default the latest month is displayed.
Work underway at the Flocculation Sedimentation Building
Sand Media being placed at the drying beds.
Rebar install at the Ozone Building
Formwork and rebar installation at the Ozone Building
Work underway at the Flocculation Sedimentation Building
3. Ozone Filters Bldg. rebar installation With the Clearwell in the background.
Concrete pump placing concrete at the Flocculation Sedimentation Building
A conveyor belt being used to spread rock/sand at the Drying Beds
Aerial view of the work underway at the Water Treatment Plant
Aerial view of the work underway at the Water Treatment Plant