Pump cans at the Water Storage Reservoir
Ozone Contactors Building
Rebar installation at the Flocculation Sedimentation deck.
Backfill at the 36” raw water line coming from the Flow split to the Flocculation Sedimentation building
Backfill on the north side of the water storage tank around the Pump cans
Formwork for Lime Silo concrete slab.
Concrete masonry units (CMU) being installed at the Administrative bldg.
Block construction underway at the Administrative/operations building
Construction continues at the Ozone Building . Wall forming, rebar installation.
Backfill around the Pump cans and water storage tank
Process piping being installed.
In place density testing at the water storage tank. As the dirt is backfilled it gets compacted and tested.
Block being installed at the Administrative/Operations building
Interior view of the rebar and framework for the Flocculation sedimentation tank.
Process piping being lined up and welded with the canned motor pumps for the Clearwell shown in the background.
Pump cans at water storage tank
Pump cans at the water storage tank on June 16