< Back to Water Treatment Plant Page
Click the months below to filter through construction photos. By default the latest month is displayed.
Back fill on the north side of the water storage tank. The vertical pipes are pump cans.
Administrative/ Operations Bldg. CMU (concrete masonry unit) Block construction continues. Administrative/ Operations Bldg. CMU (concrete masonry unit) Block construction continues.
Formwork, rebar installed for Lime silo slab.
Electrical work at the Chemical Storage Electrical room.
Ozone Contactors Structure
Open cut trench for Process piping between the Backwash Equalization and Flocculation Sedimentation structures.
36” raw water piping being welded on site. This pipe comes from the Flow split and is headed to the Flocculation Sedimentation structure
Administrative/Operations building. Contractor is working on the final lift of block and soon the structural steel roof framing will begin.
Administrative/ Operations on the South side
Block being installed at the Administrative/ Operations bldg.
Pump cans at Water Storage Tank - July 21
Process piping around site installed.