< Back to Water Treatment Plant Page
Click the months below to filter through construction photos. By default the latest month is displayed.
Moving forms at the Flocculation Sedimentation Building
Under slab plumbing at the Chemical Storage Building
Ozone building rebar for concrete slab.
Ozone building rebar installation
Rebar installation at the Ozone Building
Wall placement #2 at the Flocculation Sedimentation facility
Back wash equalization tank constructed and full of water
Ozone Contactors and Filters Installation underway. Underground piping is in, subgrade and the rock section are compacted.
Ozone building. sub-grade and rock section installation
Chemical Storage and Feed Building. Sub grade is in and base course (rock section) is being compacted.
Under slab electrical and plumbing drains being installed in the Administrative building
Flocculation Sedimentation Structure
Picture from the Deck at the Back Wash Equalization Building
Outfall Structure (in the TID canal)
Rebar placement for the bottom mat at the Ozone Building
42” FTWM through canal at old Aldrich bridge location. Bridge in the photo is the new Aldrich bridge
Aerial view of the work underway at the Water Treatment Plant- January 2022
Aerial view of the work underway at the Water Treatment Plant- January 2022
Aerial view of the work underway at the Water Treatment Plant- January 2022
Aerial view of the work underway at the Water Treatment Plant- January 2022