Filter slab, installation prior to concrete being placed
Electrical conduits for the administration building
Sludge drying bed drainage layer installation
Under slab conduit installation at the Maintenance Building
Rebar and form installation at the Flocculation Sedimentation Facility
Work under way at the Filter Building
installing drain rock and bed piping at the sludge drying beds
Rebar installation and electrical work underway at the water treatment plant.
Waterproof coating being applied to the Water Storage Tank