The first concrete placement of the water storage tank dome was completed on 9/27
The first wall pour at the Backwash Equalization Basin was recently completed.
Reinforcing bar is being placed on the northwest side of the water storage tank dome
Water storage tank dome reinforcement
The contractor continues to excavate and install 12” unthickened sludge lines for the drying beds.
The contractor continues to erect scaffolding to support the dome on the inside of the water storage tank