Turlock Finished Water Transmission Main

24-hour Construction Information:
(888) 226-0986

The Turlock Finished Water Transmission Main (FWTM) alignment will connect the WTP to a city-owned terminal storage tank to be constructed on North Quincy Road separately by the City. The transmission main will be 42-inches in diameter and approximately 7 miles long and will initially convey up to 10 million gallons per day (mgd) of surface water to Turlock. The pipeline capacity is 30 mgd, designed to support full buildout of the City of Turlock. The transmission main will be constructed primarily along Berkeley Avenue.