The Turlock Finished Water Transmission Main (FWTM) connects the WTP to a city-owned terminal storage tank being constructed on North Quincy Road separately by the City of Turlock. The transmission main is 42-inches in diameter and approximately 7 miles long and will initially convey up to 10 million gallons per day (mgd) of surface water to Turlock. The pipeline capacity is 30 mgd, designed to support full buildout of the SRWA Water Treatment Plant. The transmission main was constructed primarily along Berkeley Avenue.