24-hour Construction Information:
(888) 226-0986
The Raw Water Pipeline (also referred to as the Raw Water Transmission Main (RWTM) will convey raw river water from the Raw Water Pump Station to the Water Treatment Plant (WTP). The RWTM has a design capacity of 64.6 mgd (100 cfs) to the Flow Split Structure and a design capacity of 30 mgd (46.4 cfs) from the Flow Split Structure to the WTP.
Photos
Click the months below to filter through construction photos. By default the latest month is displayed.